INDUCING DEVELOPMENT RESULTS IN SIERRA LEONES PUBLIC SECTOR A Look at the Performance Tracking Table as a Results Tool
Ouvert
- Détails du fichier
- Size: 25MB
- Créateur / Auteur : Joan Addedis
- Type de ressource : Africa Capacity Report
- # Télécharger: 254
- Accéder: Open to Download
January, 2017
Télécharger des fichiers
AfCoPCaseStudy078.pdf
Informations de base
Créateur / Auteur
ACBF
Source / Éditeur
African Community of Practice on Management for Development result at the African Capacity Building Foundation (ACBF)
Nombre de pages
12
Détails géographiques et d'audience
Classification et domaines
Objet
Results-based management
Résumé
Sierra Leone has witnessed massive public sector reforms to maximize development results since the end of its civil war in 2002. The reforms included the introduction of results-based management (RBM). Since 2006, the country has experimented with a performance tracking table (PTT) to inject a culture of results reporting and to deliver better public services. This tool has extensively evolved and gained widespread adoption, and has been devolved to local councils, too. This study carried out an assessment of the PTT with a view to informing what needs to be done to make it more effective, and to draw lessons from its application for possible replication in other African countries. A review of documents and the general literature was undertaken, supported by interviews with selected public sector personnel to gauge perceptions of the tables successes and challenges in Sierra Leone. Key findings: The PTT tool has instilled huge awareness about the need for enforcing accountability in the public service to produce needed results for the public, especially the poor. It has also aided monitoring undertaken by civil society organizations. Major challenges that came out strongly include the low level of incentives for civil service personnel and technical capacity constraints in the application of the tool. Key recommendations: There is need to increase technical capacity and improve incentive systems in the public service as a precondition for the success of any result initiatives; the PTT and related tools should be made simpler for users; African leaders should take a firmer position in enforcing development results on the continent; and comprehensive impact studies of result monitoring tools on national development outcomes should be conducted in Africa to garner greater lessons for replication and planning.
Mots-clés
PUBLIC SECTOR REFORM - SIERRA LEONE, Performance tracking table
Connexion requise
Veuillez vous connecter ou créer un compte pour consulter et publier des commentaires.
Se connecter S'inscrire